Our Power Transmission Lines And Substation Case

Home Projects
Silverstone Electric – 33kV Power Transformer Implementation in Bangladesh

Executive Summary

Silverstone Electric, a pioneering Electric Engineering, Procurement, and Construction (EPC) company, achieved remarkable success by commissioning a state-of-the-art 33kV, 26MVA power transformer and associated electrical equipment in Bangladesh. Launched in 2017, this project stands as a testament to Silverstone Electric's expertise, innovation, and dedication to enhancing the infrastructure and reliability of electric power in developing regions. The project met all its objectives, delivering exceptional performance and reliability, which led to outstanding end-user satisfaction.

Background

Country: Bangladesh
Industry: Electric Power Distribution
Project Launch: 2017
Objective: The main objective was to modernise and expand the electrical infrastructure in Bangladesh by installing a 33kV, 26MVA power transformer. The initiative aimed to improve power reliability, efficiency, and capacity to meet the growing demand for electricity in the region.

Challenges

1. Logistical Constraints: The transportation and installation of heavy electrical equipment in a densely populated area.

2. Technical Complexities: Implementing state-of-the-art technology in an existing, outdated power distribution system.

3. Environmental and Safety Standards: Ensuring adherence to international environmental and safety standards during and post-installation.

4. End-User Satisfaction: Meeting the high expectations of local authorities and the general population regarding power quality and reliability.

Solutions

1. Strategic Planning: Meticulous planning of logistics and installation to minimise disruptions and ensure smooth execution.

2. Advanced Technology Integration: Utilizing cutting-edge technology to enhance the transformer's efficiency and reliability while ensuring compatibility with Bangladesh’s existing power grid.

3. Compliance with Standards: Rigorous testing and quality control measures were employed to meet global environmental and safety standards.

4. Continuous Support and Training: Providing comprehensive training to local engineers and technicians to ensure proficient operation and maintenance of the new infrastructure.

Results

The commissioning of the 33kV, 26MVA power transformer by Silverstone Electric marked a significant milestone in Bangladesh's journey towards improved electric power distribution. Key achievements include:

· Increased Power Capacity: The new transformer significantly boosted the region’s power capacity, catering to the increasing demand for electricity.

· Enhanced Reliability: The project markedly improved power reliability, reducing outages and disruptions.

· High Efficiency: The cutting-edge technology led to better efficiency in power distribution, resulting in lower energy losses and operational costs.

· End-User Satisfaction: The project exceeded the expectations of the local authorities and residents, evidenced by their high satisfaction with the improved power supply.

Conclusion

Silverstone Electric’s successful implementation of the 33kV, 26MVA power transformer project in Bangladesh is a benchmark for future electric infrastructure projects. By overcoming diverse challenges through innovative solutions, Silverstone Electric enhanced the region's electric power capacity and reliability and set new standards for achieving end-user satisfaction. This project exemplifies Silverstone Electric’s commitment to powering progress with sustainable and efficient energy solutions worldwide.


Recommended Products
PRODUCTS
PROJECTS
DOWNLOAD
ABOUT US
CONTACT US

© 2024 by Silverstone Electric | All rights reserved.Privacy Policy

PRODUCTS

SERVICE

HOME

PROJECTS

CONTACT